This SpaceX Status Report is updated throughout the day.
Boca Chica, Texas
Starship Testing Schedule
SN7.1 Pressurize to Failure Test
- September 21, 2020 – 9:00 pm – 6:00 am – Pressurized twice and it is still in one piece.
- Backup Date – September 22, 2020 – 9:00 pm – 6:00 am
Starship Status
- SN5 – HighBay
- 09/19/2020 – Moved into the High-Bay.
- 08/26/2020 – Moved out of the Mid-Bay to make room for SN8 stacking.
- 08/04/2020 – 150m hop test successfully completed.
- SN6 – High-Bay
- 09/19/2020 – Moved into the High-Bay.
- 09/12/2020 – Moved out of Mid-Bay.
- 09/03/2020 – 150m hop test successfully completed.
- 08/26/2020 – Mass simulator installed.
- 08/23/2020 – Static fire test successfully executed at 7:44 pm CT (00:44 UTC).
- 08/18/2020 – Raptor engine SN29 installed.
- 08/16/2020 – Ambient and cryo tests completed successfully.
- SN8 – Mid-Bay
- 09/15/2020 – Aero cover installed
- 09/13/2020 – Rear fins delivered to mid-bay.
08/29/2020 – Stacked to the usual “full” level. - 08/27/2020 – Stacking thrust section in the Mid-Bay.
- 08/21/2020 – Thrust section and top section stacked.
- 08/15/2020 – The thrust section was flipped.
- SN9 – Under construction
- 09/20/2020 – Forward dome with Tesla batteries, stacking guides, and other hardware installed spotted in the shipyard.
- 09/13/2020 – Note: I see no evidence of external “plumbing” on SN8 as of yet.
- 09/13/2020 – Three-ring stack probably part of the tank section with heat tile mounting points spotted.
- 09/13/2020 – The thrust section was flipped.
- 09/13/2020 – First ring section moved into the mid-bay for stacking.
- 09/04/2020 – Trust dome has been sleeved.
- 08/28/2020 – Forward dome sleaved with a ring stack that includes heat shield tile mounts.
- 08/15/2020 – Common dome has been sleeved.
- SN10 – Under construction
- 09/09/2020 – The upper bulkhead was sleaved with a four-ring stack. All of the previous upper bulkheads have been sleeved with a three-ring stack.
- 09/04/2020 – Thrust puck and fuel downcomer delivered.
- SN11 – Under construction
- 09/20/2020 – Common Bulkhead spotted
- 09/14/2020 – Thrust puck and fuel downcomer delivered.
- 09/09/2020 – Aft dome section spotted in the shipyard.
- SH-SN1 – Under construction
- 09/02/2020 – The first Super-Heavy booster (Per Elon Musk).
Facilities Status
- Low-Bay
- A fully stacked nosecone assembly inside the bay.
- Three other nosecone assemblies in various stages of completion are in the immediate area.
- Forward aerodynamic surfaces are also present in this area.
- Mid-Bay – SN8, SN9
- High-Bay – SN5, SN6 – Roof under construction
- Test Stand A – Empty
- Thrust simulator installed.
- Test Stand B Transport Mount – SN7.1
- Orbital Launch Mount – Under construction
- 09/12/2020 – All columns have been sleeved.
- Landing Pad – Empty
- Old Gas Well – On-site methane (CH4) propellant production?
Cape Canaveral, Florida
Launch Complex 39A (LC-39A), Kennedy Space Center
Starlink 12
- September 27, 2020, 10:43 am EDT (1443 UTC)
- This is the 13th batch of approximately 60 satellites for SpaceX’s Starlink broadband network. This will bring the total number of Starlink satellites to ~691.
Starlink 13
- NET September – TBD – This is the 14th batch of approximately 60 satellites for SpaceX’s Starlink broadband network. This will bring the total number of Starlink satellites to ~691.
Space Launch Complex 40 (SLC-40), Cape Canaveral Air Force Station
GPS 3 SV04
- Wednesday, September 30, 2020, 8:00 pm-12:00 am EDT (0000-0400 UTC)